RoadworksModerate
IN 933 in both directions (Mile Point 101.73 - 105.73): Construction work.
IN 933 in both directions: Between Ash Rd and IN 331.
...
Between Ash Rd (near Osceola) and IN 331 (Mishawaka). Look out for construction work. There is a width limit in effect . Width limit 10'0" . Until November 30, 2026 at about 5:00PM EDT. Comment: EventIcon IN 933, between Ash Rd and SR 331. Look out for construction work. Traffic lanes will be shifted over for storm sewer, ADA ramp, and asphalt paving work. There is a width limit in effect of 10 feet. Starting May 18, 2026 at about 7:00AM EDT until November 30, 2026 at about 5:00PM EDT. Contract # R-43930 Project 2100558, 2301585. For questions call 1-855-463-6848.
ReportedMay 18, 2026 at 04:00 AM PDTNovember 30, 2026 at 02:00 PM PST
Road
IN 933
Source
INDOT
Coordinates
41.66411, -86.06103
Roadworks details
Direction
BOTH_DIRECTIONS