LiveTrafik
RoadworksSevere

I-65 in both directions (Mile Point 141.51 - 143.71): Bridge construction.

I-65 in both directions: Between IN 32 and IN 47.

...

Between IN 32 and IN 47 (1 mile north of the Lebanon area). Bridge construction work is in progress due to alternating lane closures. The shoulder is closed. Until November 30, 2026 at about 11:59PM EDT. Comment: I-65 in both directions, between IN 32 and IN 47 (1 mile north of the Lebanon area). Bridge construction work is in progress due to alternating lane closures from 9:00PM to 6:00AM EDT daily, until August 31, 2026 at about 11:59PM EDT. Shoulder closures from 9:00AM to 3:00PM daily.

ReportedMay 31, 2026 at 09:00 PM PDTNovember 30, 2026 at 08:59 PM PST
Road
I-65
Source
INDOT
Coordinates
40.06538, -86.49495

Roadworks details

Direction
BOTH_DIRECTIONS

More about I-65

🚧 Roadworks
I-65 in both directions (Mile Point 141.51 - 143.71): Bridge construction. | LiveTrafik