RoadworksModerate
IN 25 in both directions (Mile Point 69.3 - 70.63): Bridge construction.
IN 25 in both directions: Between S Co Rd 400 W and CR 300 S.
...
Between S Co Rd 400 W (3 miles east of the Burrows area) and CR 300 S (2 miles west of the Logansport area). Bridge construction work is in progress. Construction traffic may be merging. Look out for construction work. Speed limit 45 mph. Until September 30, 2026 at about 7:00PM EDT. Comment: N 25 eastbound and westbound between S Co Rd 400 W (3 miles east of the Burrows area) and CR 300 S (2 miles west of the Logansport area). Bridge construction work is in progress. Construction traffic may be merging. Look out for construction work. Starting June 23, 2026 at about 6:00AM EDT until September 30, 2026 at about 7:00PM EDT. Contact INDOT @ 855-453-6848
ReportedJuly 20, 2026 at 03:00 AM PDTSeptember 30, 2026 at 04:00 PM PDT
Road
IN 25
Source
INDOT
Coordinates
40.71028, -86.44873
Roadworks details
Direction
BOTH_DIRECTIONS