RoadworksModerate
US 41 in both directions (Mile Point 265.41 - 265.66): Utility work.
US 41 in both directions: Between Main St and Ramblewood Dr.
Advertisement
...
Between Main St (Schererville) and Ramblewood Dr (Highland). Utility work is in progress. Until September 30, 2026 at about 5:00PM CDT. Comment: Utility work at the intersection US 41 & Main St. in Highland, IN. Lane restrictions will be between 9/9/2026 -7am to 09/30/2026 / 5pm Permit number T0000208911
ReportedSeptember 9, 2026 at 05:00 AM PDTSeptember 30, 2026 at 03:00 PM PDT
Road
US 41
Source
INDOT
Coordinates
41.52300, -87.47137
Roadworks details
Direction
BOTH_DIRECTIONS