RoadworksCritical
IN 2 in both directions (Mile Point 49.12 - 50.14): Utility work.
IN 2 in both directions: Between US 421 and S 900 W.
Advertisement
...
Between US 421 and S 900 W (near Westville). Utility work is in progress. A lane is closed. Look out for flaggers. All lanes are slow in both directions of travel. Until October 16, 2026 at about 4:00PM CDT.
ReportedSeptember 10, 2026 at 06:00 AM PDTOctober 16, 2026 at 02:00 PM PDT
Road
IN 2
Source
INDOT
Coordinates
41.56292, -86.89689
Roadworks details
Direction
BOTH_DIRECTIONS