RoadworksSevere
US 231 (Mile Point 86.61 - 86.45): Bridge construction.
US 231: Between I-69 and E 625 S.
...
Between I-69 and E 625 S (1 mile north of the Scotland area). Bridge construction work is in progress. There are alternating lane closures. There is a width limit in effect . Speed limit 40 mph . Width limit 13'0" . Until September 8, 2026 at about 11:59PM EDT. Comment: US 231 over Doans Creek will be reduced to one lane in each direction for minor patching and polymeric overlays. A 13' width restriction is in place.
ReportedJuly 26, 2026 at 09:00 PM PDTSeptember 8, 2026 at 08:59 PM PDT
Road
US 231
Source
INDOT
Coordinates
38.91748, -86.92209
Roadworks details
Direction
NOT_DIRECTIONAL