RoadworksModerate
US 41 in both directions (Mile Point 43.13 - 54.58): Construction work.
US 41 in both directions: Between IN 56 and US 50.
...
Between IN 56 (7 miles north of the Patoka area) and US 50 (Vincennes). Look out for construction work. There are alternating lane closures. There is a width limit in effect . Speed limit 50 mph . Width limit 14'0" . Until November 13, 2026 at about 11:59PM EDT. Comment: US41 will have alternating lane closures from approximately 0.5 miles south of SR 241, extending to Kelso Creek Bridge, approximately 0.25 miles north of Wabash Avenue on US41. A 14' width restriction is in place. Operations will include, but are not limited to, HMA patching, HMA resurfacing, ditching, left turn lane construction, and RCI construction.
ReportedMay 17, 2026 at 09:00 PM PDTNovember 13, 2026 at 08:59 PM PST
Road
US 41
Source
INDOT
Coordinates
38.51962, -87.54579
Roadworks details
Direction
BOTH_DIRECTIONS
More about US 41
US-41RoadworksLast 52 days
158roadworks
β² 205 %vs previous 26 daysAug 28today
Count per dayView US-41