RoadworksModerate
I-74 in both directions (Mile Point 112.83 - 123.19): Bridge construction.
I-74 in both directions: Between IN 9 and County Line Rd.
...
Between IN 9 (near Shelbyville) and County Line Rd (1 mile east of the Waldron area). Bridge construction work is in progress. Look out for construction work. Width limit 11'0" . Left lane closed in both directions of travel. Until December 15, 2026 at about 12:04PM EDT. Comment: Bridges on I 74 at Conns Creek and Deer Creek EB & WB left lanes closed
ReportedJuly 22, 2026 at 08:35 AM PDTDecember 15, 2026 at 09:04 AM PST
Road
I-74
Source
INDOT
Coordinates
39.55082, -85.77559
Roadworks details
Direction
BOTH_DIRECTIONS