RoadworksModerate

US 41 (Mile Point 265.41 - 265.66): Utility work.

US 41: Between Main St and Ramblewood Dr.

...

Between Main St (Schererville) and Ramblewood Dr (Highland). Utility work is in progress. Until October 23, 2026 at about 5:00PM CDT. Comment: Utility work at the intersection US 41 & Main St. in Highland, IN. Lane restrictions will start on 9/23/2026 / 7am to 10/23/2026 / 5pm Permit number T0000208911

ReportedSeptember 23, 2026 at 05:00 AM PDTOctober 23, 2026 at 03:00 PM PDT
Road
US 41
Source
INDOT
Coordinates
41.52300, -87.47137

Roadworks details

Direction
NOT_DIRECTIONAL

More about US 41

🚧 Roadworks