LiveTrafik
RoadworksSevere

US 41 (Mile Point 27.43 - 28.74): Bridge construction.

US 41: Between W 300 S and S 100 W.

...

Between W 300 S and S 100 W (1 to 2 miles south of the Princeton area). Bridge construction work is in progress. Look out for a new road layout. Be aware of narrow lanes. The roadway is shared with opposing traffic. Expect single line traffic alternating directions. There is a width limit in effect . Width limit 11'0" . Speed limit 45 mph . Until December 31, 2026 at about 11:59PM CDT. Comment: US 41 from approximately CR 100 to CR 300, South bound traffic will be using the crossover to travel south. US 41 traffic will be down to one lane each direction. An 11' width restriction is in place.

ReportedMay 19, 2025 at 05:00 AM PDTDecember 31, 2026 at 09:59 PM PST
Road
US 41
Source
INDOT
Coordinates
38.31279, -87.56856

Roadworks details

Direction
NOT_DIRECTIONAL
🚧 Roadworks
US 41 (Mile Point 27.43 - 28.74): Bridge construction. | LiveTrafik