IN 10 (Mile Point 3.37 - 3.98): Construction work.
IN 10: Between Airport Dr and US 41.
Between Airport Dr and US 41 (near Lake Village). Look out for construction work. Bridge construction work is in progress. A lane is closed. The roadway is reduced to one lane. Look out for temporary traffic lights. There is a width limit in effect . Speed restrictions are in force. Speed limit 45 mph . Width limit 11'0" . Until September 18, 2026 at about 5:00PM CDT. Comment: Between Airport Dr and US 41 (near Lake Village). Construction work. Bridge construction. Lane closed. Roadway reduced to one lane. Temporary traffic lights. Width limit in effect. Speed restrictions in force. Speed limit 45 mph. Width limit 11'0". Starting September 2, 2026 at 8:00AM EDT until September 18, 2026 at about 6:00PM EDT. Bridge deck overlay for contract B-45593. Temp traffic lights will be in use. Speed is reduced to 45 mph and a width limit of 11 ft. First phase EB closed second phase WB closed.