RoadworksModerate
US 20 (Mile Point 78.58 - 76.05): Paving operations.
US 20: Between Exit 76 and US 31.
...
Between Exit 76 and US 31 (South Bend). The road is being repaved. Comment: Spot paving in the driving lane
ReportedJuly 20, 2026 at 02:45 PM PDTMay 9, 2030 at 12:05 PM PDT
Road
US 20
Source
INDOT
Coordinates
41.64103, -86.29765
Roadworks details
Direction
NOT_DIRECTIONAL