Roadworks
US 40 (Mile Point 15.35 - 14.72): Construction work.
US 40: Between Stop 19 Rd and Taber Rd.
...
Between Stop 19 Rd and Taber Rd (Seelyville). Look out for construction work.
ReportedApril 29, 2026 at 09:00 PM PDTMay 30, 2030 at 04:29 AM PDT
Road
US 40
Source
INDOT
Coordinates
39.49290, -87.27354
Roadworks details
Direction
NOT_DIRECTIONAL