RoadworksModerate
I-94 eastbound (Mile Point 25.99 - 30.58): Construction work.
I-94 eastbound: Between IN 49 and N 500 E.
Advertisement
...
Between IN 49 and N 500 E (4 miles east of the Chesterton area). Look out for construction work. A lane is closed. The shoulder is closed. Height limit 14'9" . Right lane closed in the eastbound direction of travel. Until September 30, 2026 at about 11:00PM CDT. Comment: Weigh scales will be accessible. Height limit in effect from SR 49 to US 421 eastbound. Height limit is 14'9"
ReportedSeptember 8, 2026 at 03:00 AM PDTSeptember 30, 2026 at 09:00 PM PDT
Road
I-94
Source
INDOT
Coordinates
41.62451, -87.04557
Roadworks details
Direction
POSITIVE_DIRECTION