LiveTrafik
RoadworksModerate

IN 109 in both directions (Mile Point 21.8 - 34.15): Paving operations.

IN 109 in both directions: Between US 30 and US 33.

...

Between US 30 and US 33 (11 miles north of the Columbia City area). The road is being repaved. Until October 31, 2026 at about 5:00PM EDT. Comment: IN 109, between US30 and US33 (Columbia City north to Wolf Lake) is under construction for pavement resurfacing. Traffic will be controlled by flaggers with alternating lanes. Expect Delays; Slow down. Starting July 6, 2026 at about 7:00 am EDT until October 31, 2026 at about 5:00 pm. Weather permitting.

ReportedJuly 6, 2026 at 04:00 AM PDTOctober 31, 2026 at 02:00 PM PDT
Road
IN 109
Source
INDOT
Coordinates
41.16905, -85.49154

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
IN 109 in both directions (Mile Point 21.8 - 34.15): Paving operations. | LiveTrafik