LiveTrafik
RoadworksModerate

US 12 in both directions (Mile Point 14.99 - 15.35): Bridge maintenance operations.

US 12 in both directions: Between Alabama St and Indiana Toll Road.

...

Between Alabama St and Indiana Toll Road (Gary). Bridge maintenance work is in progress. Until September 11, 2026 at about 5:00PM CDT. Comment: Bridge Painting at Alabama St and US20 in Gary, IN. Lane restrictions will start on 08/24/26/ 7am to 09/11/26 5pm Permit Number - E26LMI0115

ReportedAugust 24, 2026 at 05:00 AM PDTSeptember 11, 2026 at 03:00 PM PDT
Road
US 12
Source
INDOT
Coordinates
41.59954, -87.31355

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 12 in both directions (Mile Point 14.99 - 15.35): Bridge maintenance operations. | LiveTrafik