RoadworksSevere
I-64 (Mile Point 0.04 - 2): Bridge construction.
I-64: Between the start of I-64 and IN 69.
...
Between the start of I-64 and IN 69 (2 to 4 miles west of the Griffin area). Bridge construction work is in progress. The roadway is shared with opposing traffic. Overloads are not permitted . There is a width limit in effect . Speed limit 55 mph . Width limit 12'6" . Comment: Westbound traffic on I-64 will be shifted via crossover to an Eastbound lane. There will be opposing traffic. A 12'6" width limit is in place.
ReportedJuly 30, 2026 at 04:21 AM PDTMay 19, 2030 at 01:41 AM PDT
Road
I-64
Source
INDOT
Coordinates
38.22829, -87.98387
Roadworks details
Direction
NOT_DIRECTIONAL