LiveTrafik
RoadworksModerate

US 30 in both directions (Mile Point 2.8 - 0.08): Construction work.

US 30 in both directions: Between Lake St and US 41.

...

Between Lake St (Dyer) and US 41 (Schererville). Look out for construction work. Until September 18, 2026 at about 3:00PM CDT. Comment: Pavement coring along US 30 from US 41 to State Line. Lane restrictions will start on 08/24/26 8am to 09/18/26 3pm. Permit number E26LOB0238

ReportedAugust 24, 2026 at 06:00 AM PDTSeptember 18, 2026 at 01:00 PM PDT
Road
US 30
Source
INDOT
Coordinates
41.49429, -87.52376

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 30 in both directions (Mile Point 2.8 - 0.08): Construction work. | LiveTrafik