US 30 in both directions (Mile Point 64.02 - 65.91): Bridge construction.
US 30 in both directions: Between Oak Dr and Plymouth Goshen Tr.
Between Oak Dr and Plymouth Goshen Tr (near Plymouth). Bridge construction work is in progress. A lane is closed. Speed restrictions are in force. Speed limit 45 mph . Width limit 11'0" . Left lane closed in both directions of travel. Until November 21, 2026 at about 5:00PM EDT. Comment: During this phase of construction, traffic will be restricted to one lane in each direction with the inside lanes closed. Ramps to SR 17 (Michigan Street) will remain open. This phase of construction will continue until Tuesday September 8, 2026. Starting on September 8, 2026 eastbound traffic will merge to the westbound inside lane utilizing crossovers. Two-way traffic will be maintained between the crossovers. During this phase of work the eastbound lanes will be closed between the crossovers for bridge deck overlays and concrete pavement repairs. During this phase of construction, the exit ramp from eastbound US 30 to State Road 17 (Michigan St.) will be closed and traffic will be utilizing a detour to US 31 and back. All work should be completed prior to November 21, 2026. For further information contact INDOT 1-855-463-6848.