LiveTrafik
RoadworksModerate

IN 3 (Mile Point 195 - 195.98): Bridge construction.

IN 3: Between Baseline Rd and IN 8.

...

Between Baseline Rd and IN 8 (near Avilla). Bridge construction work is in progress. There is a width limit in effect . There are alternating lane closures. Speed restrictions are in force. Width limit 13'0" . Speed limit 50 mph . Until December 31, 2026 at about 11:59PM EDT. Comment: IN 3, between Baseline Rd and IN 8 (near Avilla). Bridge construction work is in progress. There is a width limit in effect. There are alternating lane closures. Speed restrictions are in force. Width limit 13'0". Speed limit 50 MPH. Until December 31, 2026 at about 11:59PM EDT.

ReportedMarch 24, 2026 at 09:00 PM PDTDecember 31, 2026 at 08:59 PM PST
Road
IN 3
Source
INDOT
Coordinates
41.35128, -85.22121

Roadworks details

Direction
NOT_DIRECTIONAL
🚧 Roadworks
IN 3 (Mile Point 195 - 195.98): Bridge construction. | LiveTrafik