RoadworksCritical
IN 8 in both directions (Mile Point 12.05 - 14.07): Utility work.
IN 8 in both directions: Between S 500 E and S 1200 W.
...
Between S 500 E (2 miles east of the Kouts area) and S 1200 W (1 mile west of the La Crosse area). Utility work is in progress. A lane is closed. Look out for flaggers. All lanes are slow in both directions of travel. Until September 25, 2026 at about 4:00PM CDT.
ReportedAugust 24, 2026 at 06:00 AM PDTSeptember 25, 2026 at 02:00 PM PDT
Road
IN 8
Source
INDOT
Coordinates
41.31776, -86.96808
Roadworks details
Direction
BOTH_DIRECTIONS