RoadworksSevere
I-70 in both directions: Paving operations.
I-70 in both directions: Between US 40 and MM 185.
...
Between US 40 and MM 185 (near Tecumseh). The road is being repaved. Speed limit 65 mph . Width limit 12'0" . Comment: Pavement patching, UBAS surfacing, & shoulder seal.
ReportedJune 23, 2026 at 07:28 AM PDTApril 12, 2030 at 04:48 AM PDT
Road
I-70
Source
KDOT
Coordinates
39.03171, -95.59005
Roadworks details
Direction
BOTH_DIRECTIONS