RoadworksSevere
IN 64 (Mile Point 50.77 - 51): Construction work.
IN 64: Between 100 E and Club Rd.
...
Between 100 E and Club Rd (3 miles east of the Huntingburg area). Look out for construction work. Look out for a new road layout. There is a roundabout . There is a width limit in effect . Look out for flaggers. Traffic restrictions are in force . Speed limit 45 mph . Width limit 12'0" . Until September 12, 2026 at about 5:00PM EDT. Comment: SR 64 EB/WB look out for roundabout for Phase 1 construction. . A 12' width restriction is in place.
ReportedJuly 8, 2026 at 05:00 AM PDTSeptember 12, 2026 at 02:00 PM PDT
Road
IN 64
Source
INDOT
Coordinates
38.30263, -86.87293
Roadworks details
Direction
NOT_DIRECTIONAL