RoadworksModerate
US 31 in both directions (Mile Point 255.88 - 254.91): Bridge construction.
US 31 in both directions: Between Nimitz Parkway and Exit 265: Cleveland Rd.
...
Between Nimitz Parkway and Exit 265: Cleveland Rd (South Bend). Bridge construction work is in progress. The right lane is closed. The right shoulder is closed. Right lane closed in both directions of travel. Until November 20, 2026 at about 7:00PM EDT. Comment: ITRCC bridge rehabilitation at exit 72. Bridge construction work is in progress. The right lane is closed. The right shoulder is closed. Please contact 855-INDOT4U (855-463-6848) with any questions, comments, or concerns.
ReportedAugust 3, 2026 at 04:00 AM PDTNovember 20, 2026 at 04:00 PM PST
Road
US 31
Source
INDOT
Coordinates
41.72256, -86.33911
Roadworks details
Direction
BOTH_DIRECTIONS