LiveTrafik
RoadworksModerate

Mayflower Road in both directions: Road construction.

Mayflower Road in both directions: Between Belleville Circle and Trunk Trail in South Bend.

...

Between Belleville Circle and Trunk Trail in South Bend. Road construction work is in progress. The road is being repaved. There are alternating lane closures. Width limit 14'0" . Until October 30, 2026 at about 7:00PM EDT. Comment: Contract R-46148. Between Belleville Circle and Trunk Trail in South Bend. Road construction. Paving operations. Alternating lane closures. Width limit 14'0". Starting August 10, 2026 at 7:00AM EDT until October 30, 2026 at about 7:00PM EDT.. 1-855-indot-4-u

ReportedAugust 10, 2026 at 04:00 AM PDTOctober 30, 2026 at 04:00 PM PDT
Road
Mayflower Road
Source
INDOT
Coordinates
41.65833, -86.32198

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
Mayflower Road in both directions: Road construction. | LiveTrafik