RoadworksCritical
I-69 (Mile Point 94.16 - 96.78): Bridge maintenance operations.
I-69: Between US 231 and Exit 98.
...
Between US 231 and Exit 98 (6 to 8 miles north of the Scotland area). Bridge maintenance work is in progress. There are alternating lane closures. Traffic restrictions are in force . Speed limit 60 mph . Width limit 12'0" . Until September 22, 2026 at about 12:00AM EDT. Comment: I-69 over county road 750E, Dry BR Plumr, 6.90 miles East of US 231 will be reduced to one lane in each direction to perform minor patching and polymeric overlays. A 12' width restriction is in place.
ReportedAugust 19, 2026 at 03:00 AM PDTSeptember 21, 2026 at 09:00 PM PDT
Road
I-69
Source
INDOT
Coordinates
38.96230, -86.81304
Roadworks details
Direction
NOT_DIRECTIONAL