LiveTrafik
RoadworksModerate

US 20 in both directions (Mile Point 23.11 - 23.86): Utility work.

US 20 in both directions: Between Willow Creek Rd and IN 249.

...

Between Willow Creek Rd and IN 249 (near Portage). Utility work is in progress. The right shoulder is closed. Outside shoulder is closed in both directions of travel. Until September 10, 2026 at about 5:00PM CDT. Comment: Comcast to install fiber optic lines in the area.

ReportedAugust 10, 2026 at 06:00 AM PDTSeptember 10, 2026 at 03:00 PM PDT
Road
US 20
Source
INDOT
Coordinates
41.59845, -87.17945

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 20 in both directions (Mile Point 23.11 - 23.86): Utility work. | LiveTrafik