RoadworksModerate
I-70 westbound (Mile Point 17.75): Construction work.
I-70 westbound: Between IN 42 and Tabortown St.
...
Between IN 42 and Tabortown St (3 miles east of the Terre Haute area). Look out for construction work. Speed limit 55 mph. Until November 19, 2026 at about 5:00PM EDT. Comment: I-70 WB look out for bridge demolition and construction work near the 18.0 MM. Work will start in the median and then move to the WB bridge. There will be a lane shift to the median and across temporary bridge. No lane restrictions/closures. Speed limit 55 MPH.
ReportedJuly 13, 2026 at 04:00 AM PDTNovember 19, 2026 at 02:00 PM PST
Road
I-70
Source
INDOT
Coordinates
39.44556, -87.21537
Roadworks details
Direction
NEGATIVE_DIRECTION