RoadworksModerate
US 40 in both directions (Mile Point 30.23 - 31.92): Right lane closed.
US 40 in both directions: Between S 800 W and W CR 775 S.
...
Between S 800 W and W CR 775 S (3 to 5 miles east of the Harmony area). The right lane is closed because of bridge maintenance work. Until October 2, 2026 at about 7:00PM EDT. Comment: Construction work at US 40, bridge over Walnut Creek, 6.61 Miles west of SR-243 at mile marker 30+63. Right lane will be restricted as needed because of bridge scour protection maintenance work. Work will start on or after June 1st, 2026 at about 8:00AM EDT until October 2, 2026. There is a 14' 2" width restriction.
ReportedJune 1, 2026 at 05:00 AM PDTOctober 2, 2026 at 04:00 PM PDT
Road
US 40
Source
INDOT
Coordinates
39.54987, -86.99515
Roadworks details
Direction
BOTH_DIRECTIONS