RoadworksModerate
IN 3 (Mile Point 40.4 - 40.05): Road construction.
IN 3: Between CR 300 S and S Co Rd 50 E.
...
Between CR 300 S and S Co Rd 50 E (1 mile south of the Vernon area). Road construction work is in progress. Until December 31, 2026 at about 10:00AM EDT.
ReportedAugust 19, 2026 at 10:30 AM PDTDecember 31, 2026 at 07:00 AM PST
Road
IN 3
Source
INDOT
Coordinates
38.96701, -85.60212
Roadworks details
Direction
NOT_DIRECTIONAL