RoadworksModerate
US 218: Bridge construction.
US 218: Between 7th Avenue Northeast and I-90.
...
Between 7th Avenue Northeast and I-90 (Austin). Bridge construction work is in progress. The bridge is closed. A detour is in operation. Width limit 11'0" . Please follow the Minnesota DOT-recommended detour around the closure. See map for detour(s) . Until September 9, 2026 at about 8:00PM CDT.
ReportedApril 17, 2026 at 10:00 AM PDTSeptember 9, 2026 at 06:00 PM PDT
Road
US 218
Source
MnDOT
Coordinates
43.67361, -92.93943
Roadworks details
Direction
NOT_DIRECTIONAL