RoadworksModerate
I-94 in both directions: Bridge construction.
I-94 in both directions: Between Exit 50 and Exit 55: Otter Tail County Road 1.
...
Between Exit 50 and Exit 55: Otter Tail County Road 1 (Fergus Falls). Bridge construction work is in progress. There is head to head traffic on the roadway. Advisory speed limit 60.00 mph . Width limit 12'0" . The left lane is closed both directions. Until October 30, 2026 at about 7:00PM CDT. Comment: Bridge work at the Highway 210 overpass. Slow down, watch for workers and trucks. For additional information on this project, Click Here
ReportedApril 27, 2026 at 05:00 AM PDTOctober 30, 2026 at 05:00 PM PDT
Road
I-94
Source
MnDOT
Coordinates
46.29340, -96.12269
Roadworks details
Direction
BOTH_DIRECTIONS