LiveTrafik
RoadworksModerate

MN 61 in both directions: Construction work.

MN 61 in both directions: Between I-35; London Road and Brighton Beach Road.

...

Between I-35; London Road and Brighton Beach Road (Duluth). Look out for construction work. Please follow the Minnesota DOT-recommended detour around the closure. See map for detour(s) . Left lane closed in the southbound direction of travel. Until October 9, 2026 at about 3:00PM CDT.

ReportedJune 22, 2026 at 05:00 AM PDTOctober 9, 2026 at 01:00 PM PDT
Road
MN 61
Source
MnDOT
Coordinates
46.80881, -92.06119

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks