LiveTrafik
RoadworksModerate

US 14 in both directions: Construction work.

US 14 in both directions: Between Wacholz Drive and County Highway 21.

...

Between Wacholz Drive (Stockton) and County Highway 21 (Winona). Look out for construction work. Expect single lane traffic alternating directions. A pilot car is in operation. Look out for flaggers. Width limit 12'0" . Until September 18, 2026 at about 5:00PM CDT. Comment: For additional information on this project, Click Here

ReportedJuly 27, 2026 at 04:00 AM PDTSeptember 18, 2026 at 03:00 PM PDT
Road
US 14
Source
MnDOT
Coordinates
44.02732, -91.75753

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 14 in both directions: Construction work. | LiveTrafik