RoadworksModerate
US 14 in both directions: Construction work.
US 14 in both directions: Between Wacholz Drive and County Highway 21.
...
Between Wacholz Drive (Stockton) and County Highway 21 (Winona). Look out for construction work. Expect single lane traffic alternating directions. A pilot car is in operation. Look out for flaggers. Width limit 12'0" . Until September 18, 2026 at about 5:00PM CDT. Comment: For additional information on this project, Click Here
ReportedJuly 27, 2026 at 04:00 AM PDTSeptember 18, 2026 at 03:00 PM PDT
Road
US 14
Source
MnDOT
Coordinates
44.02732, -91.75753
Roadworks details
Direction
BOTH_DIRECTIONS