LiveTrafik
RoadworksModerate

US 12 in both directions: Construction work.

US 12 in both directions: Between May Street and Shoreline Drive.

...

Between May Street and Shoreline Drive (Wayzata). Look out for construction work. There is a width limit in effect . Width limit 11'0" . Until November 26, 2026 at about 12:00AM CDT.

ReportedMay 11, 2026 at 03:00 AM PDTNovember 25, 2026 at 10:00 PM PST
Road
US 12
Source
MnDOT
Coordinates
44.97408, -93.53617

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks