LiveTrafik
RoadworksModerate

US 52 in both directions: Bridge construction.

US 52 in both directions: At Exit ramp to I-90 W.

...

At Exit ramp to I-90 W. Bridge construction work is in progress. The entrance ramp is closed. A detour is in operation. Please follow the Minnesota DOT-recommended detour around the closure. See map for detour(s) . Until November 13, 2026 at about 9:00PM CDT. Comment: For additional information on this project, Click Here

ReportedApril 1, 2026 at 04:00 AM PDTNovember 13, 2026 at 07:00 PM PST
Road
US 52
Source
MnDOT
Coordinates
43.95225, -92.35723

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 52 in both directions: Bridge construction. | LiveTrafik