RoadworksModerate
US 52 southbound: Bridge construction.
US 52 southbound: Between 500th Street and US 63.
...
Between 500th Street and US 63 (1 mile south of Oronoco). Bridge construction work is in progress. Right lane closed in the southbound direction of travel. Until October 30, 2026 at about 12:00AM CDT.
ReportedAugust 24, 2026 at 12:01 PM PDTOctober 29, 2026 at 10:00 PM PDT
Road
US 52
Source
MnDOT
Coordinates
44.13326, -92.52417
Roadworks details
Direction
NEGATIVE_DIRECTION