RoadworksModerate
US 52 southbound: Bridge construction.
US 52 southbound: Between 500th Street and US 63.
...
Between 500th Street and US 63 (1 mile south of Oronoco). Bridge construction work is in progress. The roadway is reduced to one lane. Work zone is active. Right lane closed in the southbound direction of travel. Until October 16, 2026 at about 12:00AM CDT.
ReportedAugust 24, 2026 at 12:01 PM PDTOctober 15, 2026 at 10:00 PM PDT
Road
US 52
Source
MnDOT
Coordinates
44.13320, -92.52415
Roadworks details
Direction
NEGATIVE_DIRECTION