RoadworksModerate
IA 149 in both directions: Road construction.
IA 149 in both directions: Between IA 92 and IA 22.
...
Between IA 92 (near Sigourney) and IA 22 (Webster). Road construction work is in progress. A lane is closed intermittently. Until September 24, 2026 at about 1:00PM CDT. Full schedule below: β’ August 31, 7:00AM - September 24, 1:00PM Comment: Fairfield RCE (641-469-4090) - Keokuk County
ReportedAugust 31, 2026 at 05:00 AM PDTSeptember 24, 2026 at 11:00 AM PDT
Road
IA 149
Source
Iowa DOT
Coordinates
41.33827, -92.18094
Roadworks details
Direction
BOTH_DIRECTIONS