LiveTrafik
RoadworksModerate

US 69 in both directions: Road construction.

US 69 in both directions: Between 1st Street and County Road F22.

...

Between 1st Street and County Road F22 (Ankeny). Road construction work is in progress. A lane is closed intermittently. There is a width limit in effect . Width limit 10'0" . Until November 30, 2026 at about 5:00PM CDT. Full schedule below: β€’ April 16, 2025, 8:00AM - November 30, 5:00PM Comment: Grimes RCE (800-251-2707) - Polk County

ReportedApril 16, 2025 at 06:00 AM PDTNovember 30, 2026 at 03:00 PM PST
Road
US 69
Source
Iowa DOT
Coordinates
41.74228, -93.60024

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 69

🚧 Roadworks