LiveTrafik
RoadworksModerate

US 63 in both directions: Road construction.

US 63 in both directions: Between US 18 and County Road B22.

...

Between US 18 and County Road B22 (1 mile north of the New Hampton area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 10'0" . Until November 11, 2026 at about 5:00PM CDT. Full schedule below: β€’ June 15, 6:30AM - November 11, 5:00PM Comment: New Hampton RCE (800-373-7343) - Chickasaw County

ReportedJune 15, 2026 at 04:30 AM PDTNovember 11, 2026 at 03:00 PM PST
Road
US 63
Source
Iowa DOT
Coordinates
43.08500, -92.31733

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 63

🚧 Roadworks
US 63 in both directions: Road construction. | LiveTrafik