RoadworksModerate

US 63 in both directions: Road construction.

US 63 in both directions: Between US 18 and County Road B22.

...

Between US 18 and County Road B22 (1 mile north of the New Hampton area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 10'0" . Until October 14, 2026 at about 5:00PM CDT. Full schedule below: • June 15, 6:30AM - October 14, 5:00PM Comment: New Hampton RCE (800-373-7343) - Chickasaw County

ReportedJune 15, 2026 at 04:30 AM PDTOctober 14, 2026 at 03:00 PM PDT
Road
US 63
Source
Iowa DOT
Coordinates
43.08500, -92.31733

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks