RoadworksModerate
IA 2 in both directions: Road construction.
IA 2 in both directions: Between County Road W78 and County Road X23.
...
Between County Road W78 (4 miles east of the Donnellson area) and County Road X23 (2 miles west of the Fort Madison area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 14'0" . Until October 22, 2026 at about 12:00PM CDT. Full schedule below: β’ May 26, 7:00AM - October 22, 12:00PM Comment: Fairfield RCE (641-469-4090) - Lee County
ReportedMay 26, 2026 at 05:00 AM PDTOctober 22, 2026 at 10:00 AM PDT
Road
IA 2
Source
Iowa DOT
Coordinates
40.62904, -91.48057
Roadworks details
Direction
BOTH_DIRECTIONS