RoadworksSevere
I-80 eastbound: Road construction.
I-80 eastbound: Between Exit 182 and US 63.
...
Between Exit 182 and US 63 (near Grinnell). A Waze user reported road construction.
ReportedSeptember 2, 2026 at 05:55 PM PDTJune 22, 2030 at 03:16 PM PDT
Road
I-80
Source
Iowa DOT
Coordinates
41.69494, -92.70750
Roadworks details
Direction
POSITIVE_DIRECTION