RoadworksModerate
IA 76 in both directions: Road construction.
IA 76 in both directions: Between US 18 and County Road X52.
...
Between US 18 and County Road X52 (2 miles north of the Marquette area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 17'0" . Until Friday, at about 5:00PM CDT. Full schedule below: β’ June 29, 8:00AM - September 4, 5:00PM Comment: New Hampton RCE (800-373-7343) - Allamakee County
ReportedJune 29, 2026 at 06:00 AM PDTSeptember 4, 2026 at 03:00 PM PDT
Road
IA 76
Source
Iowa DOT
Coordinates
43.08546, -91.18167
Roadworks details
Direction
BOTH_DIRECTIONS