RoadworksModerate
US 30 in both directions: Road construction.
US 30 in both directions: Between Exit 268: Lisbon Blvd and IA 38.
...
Between Exit 268: Lisbon Blvd (1 mile east of the Lisbon area) and IA 38 (near Stanwood). Road construction work is in progress. A lane is closed intermittently. Until October 1, 2026 at about 12:00PM CDT. Full schedule below: β’ August 10, 7:00AM - October 1, 12:00PM Comment: Cedar Rapids RCE (877-226-8110) - Cedar County
ReportedAugust 10, 2026 at 05:00 AM PDTOctober 1, 2026 at 10:00 AM PDT
Road
US 30
Source
Iowa DOT
Coordinates
41.91861, -91.35006
Roadworks details
Direction
BOTH_DIRECTIONS