LiveTrafik
RoadworksModerate

US 30 in both directions: Road construction.

US 30 in both directions: Between Exit 268: Lisbon Blvd and IA 38.

...

Between Exit 268: Lisbon Blvd (1 mile east of the Lisbon area) and IA 38 (near Stanwood). Road construction work is in progress. A lane is closed intermittently. Until October 1, 2026 at about 12:00PM CDT. Full schedule below: β€’ August 10, 7:00AM - October 1, 12:00PM Comment: Cedar Rapids RCE (877-226-8110) - Cedar County

ReportedAugust 10, 2026 at 05:00 AM PDTOctober 1, 2026 at 10:00 AM PDT
Road
US 30
Source
Iowa DOT
Coordinates
41.91861, -91.35006

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 30 in both directions: Road construction. | LiveTrafik