LiveTrafik
RoadworksModerate

US 18 in both directions: Road construction.

US 18 in both directions: Between IA 4 and County Road N60.

...

Between IA 4 and County Road N60 (Emmetsburg). Road construction work is in progress. The roadway is shared with opposing traffic. There is a width limit in effect . Width limit 10'0" . Until September 24, 2026 at about 2:00PM CDT. Full schedule below: β€’ July 20, 7:00AM - September 24, 2:00PM Comment: Cherokee RCE (712-225-5786) - Palo Alto County

ReportedJuly 20, 2026 at 05:00 AM PDTSeptember 24, 2026 at 12:00 PM PDT
Road
US 18
Source
Iowa DOT
Coordinates
43.11196, -94.69042

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 18 in both directions: Road construction. | LiveTrafik