LiveTrafik
RoadworksModerate

US 18 in both directions: Road construction.

US 18 in both directions: Between County Road V68 and IA 150.

...

Between County Road V68 and IA 150 (6 miles west of the West Union area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 16'6" . Until October 2, 2026 at about 5:00PM CDT. Full schedule below: β€’ August 24, 7:00AM - October 2, 5:00PM Comment: New Hampton RCE (800-373-7343) - Fayette County

ReportedAugust 24, 2026 at 05:00 AM PDTOctober 2, 2026 at 03:00 PM PDT
Road
US 18
Source
Iowa DOT
Coordinates
42.96482, -91.95672

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 18 in both directions: Road construction. | LiveTrafik