LiveTrafik
RoadworksModerate

US 218 in both directions: Road construction.

US 218 in both directions: Between IA 92 and Exit 239.

...

Between IA 92 (6 miles north of the Crawfordsville area) and Exit 239 (Iowa City). Road construction work is in progress. A lane is closed intermittently. Until November 3, 2026 at about 1:00PM CDT. Full schedule below: β€’ April 27, 7:00AM - November 3, 1:00PM Comment: Fairfield RCE (641-469-4090) - Washington County

ReportedApril 27, 2026 at 05:00 AM PDTNovember 3, 2026 at 11:00 AM PST
Road
US 218
Source
Iowa DOT
Coordinates
41.66463, -91.60814

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 218

🚧 Roadworks
US 218 in both directions: Road construction. | LiveTrafik