LiveTrafik
Traffic messageCritical

IN 9 (Mile Point 87.56 - 86.59): Bridge closed.

IN 9: Between W 1425 N and E 1525 N.

...

Between W 1425 N and E 1525 N (1 to 2 miles north of the Alexandria area). The bridge is closed. A detour is in operation. Bridge construction work is in progress. See map for detour(s). Until September 30, 2026 at about 5:00PM EDT. Comment: IN 9, between W 1425 N and E 1525 N (1 to 2 miles north of the Alexandria area). The bridge is closed. A detour is in operation. Bridge construction work is in progress. See map for detour(s). Starting July 6, 2026 at about 6:00AM EDT until September 30, 2026 at about 5:00PM EDT.

ReportedJuly 6, 2026 at 03:00 AM PDTSeptember 30, 2026 at 02:00 PM PDT
Road
IN 9
Source
INDOT
Coordinates
40.31376, -85.67178

Roadworks details

Direction
NOT_DIRECTIONAL
⚠️ Traffic message