LiveTrafik
Traffic messageModerate

IN 39 in both directions (Mile Point 161.59 - 163): Bridge closed.

IN 39 in both directions: Between 50 S and IN 8.

...

Between 50 S and IN 8 (17 to 18 miles south of the LaPorte area). The bridge is closed due to bridge construction work. See map for detour(s). Until September 21, 2026 at about 5:00PM CDT. Comment: For Contract B -43906 Project: 2100751 IN 39 in both directions between 50 S and IN 8 (17 miles south of the LaPorte area). The bridge is closed over the Yellow River due to bridge construction work. Starting August 3, 2026 at about 7:00AM CDT until September 21, 2026 at about 5:00PM CDT.

ReportedAugust 3, 2026 at 05:00 AM PDTSeptember 21, 2026 at 03:00 PM PDT
Road
IN 39
Source
INDOT
Coordinates
41.29536, -86.73713

Roadworks details

Direction
BOTH_DIRECTIONS
⚠️ Traffic message
IN 39 in both directions (Mile Point 161.59 - 163): Bridge closed. | LiveTrafik